Project’s Overview
The Berkman Dam and Hydroelectric Power Plant, also known as the Lower Ceyhan Hydropower Project, is located on the Ceyhan River in southern Türkiye. The project was carried out by the Özaltın–Nurol Joint Venture, led by Özaltın Construction. The dam has a crest length of 345 metres and a structural height of 27 metres.
The composite dam comprises an earth embankment on the right flank of the valley and concrete structures on the left bank of the river. The embankment has a fill volume of 230,000 m³, and the concrete section was built using a total of 200,000 m³ of concrete. The powerhouse and its integrated water intake required 130,000 m³ of concrete.The overflow spillway, which has four radial gates, lies between the embankment and the intake. Its construction utilized 70,000 m³ of concrete.
Construction involved the installation of three pit-type, horizontal-axis Kaplan turbine-generator units in a semi-outdoor powerhouse. The units have a combined installed capacity of 39 MW. The scope also encompassed a 170 kV switchyard to feed the electricity generated by the plant into the transmission network.
Construction began in 2007, and the plant reached full operation in 2010.
providing Companies
Enova Energy