Oşkan Dam and Hydroelectric Power Plant

  • 01 Oskan Ceyhan 2 Baraji Ve Hes
  • 02 Oskan Ceyhan 2 Baraji Ve Hes
  • 03 Oskan Ceyhan 2 Baraji Ve Hes
  • 04 Oskan Ceyhan 2 Baraji Ve Hes
  • 05 Oskan Ceyhan 2 Baraji Ve Hes
  • 06 Oskan Ceyhan 2 Baraji Ve Hes
  • 07 Oskan Ceyhan 2 Baraji Ve Hes
  • 08 Oskan Ceyhan 2 Baraji Ve Hes
  • 09 Oskan Ceyhan 2 Baraji Ve Hes
    FACTS & FIGURES
    Location:

    Osmaniye, TÜRKİYE

    Investment Company:

    Enova Energy

    Shareholding:

    Özaltın İnşaat 50%; Nurol İnşaat 50%

    Contract Model:

    Build-Operate-Transfer (BOT)

    Concession Period:

    49 years

    Installed Capacity:

    25 MW

    Annual Power Generation:

    109 million kWh

    Project Status:

    Operational

    Project’s Overview

    The Oşkan Dam and Hydroelectric Power Plant, also referred to as the Upper Ceyhan Hydropower Project, is located on the mainstream of the Ceyhan River in Osmaniye Province, southern Türkiye. With an installed capacity of 25 MW, this high-flow, low-head development is the first of two hydropower projects in the Ceyhan River cascade. The two projects have a combined installed capacity of 64 MW and were structured under a build–operate–transfer (BOT) arrangement with a 49-year concession period.

    Enova Energy Company implemented the Oşkan project and currently owns and operates the plant. The company was jointly constituted by Özaltın Construction and Nurol Construction, with respective ownership percentages of 50% each.
    The composite dam extends across the Ceyhan River valley. It has a crest length of 305 m and a hydraulic height of 14.5 m.

    The powerhouse hosts three pit-type, horizontal-shaft Kaplan turbine-generator units, each rated at 8.3 MW. Construction began in late 2007, and all three units were placed into commercial operation in 2010.

    The Oşkan hydroelectric power plant generates approximately 109 million kWh of renewable electricity annually. At this level of generation, it could reduce greenhouse gas emissions by approximately 58,300 tonnes of CO₂ per year.

    FACTS & FIGURES
    Location:

    Osmaniye, TÜRKİYE

    Investment Company:

    Enova Energy

    Shareholding:

    Özaltın İnşaat 50%; Nurol İnşaat 50%

    Contract Model:

    Build-Operate-Transfer (BOT)

    Concession Period:

    49 years

    Installed Capacity:

    25 MW

    Annual Power Generation:

    109 million kWh

    Project Status:

    Operational