Oşkan Dam and HEPP

  • 01 Oskan Ceyhan 2 Baraji Ve Hes
  • 02 Oskan Ceyhan 2 Baraji Ve Hes
  • 03 Oskan Ceyhan 2 Baraji Ve Hes
  • 04 Oskan Ceyhan 2 Baraji Ve Hes
  • 05 Oskan Ceyhan 2 Baraji Ve Hes
  • 06 Oskan Ceyhan 2 Baraji Ve Hes
  • 07 Oskan Ceyhan 2 Baraji Ve Hes
  • 08 Oskan Ceyhan 2 Baraji Ve Hes
  • 09 Oskan Ceyhan 2 Baraji Ve Hes
FACTS & FIGURES

The Oşkan dam and hydroelectric power plant are situated on the mainstream of the Ceyhan River basin in Osmaniye province in southern Türkiye. The dam has a crest length of 350 meters across the river channel and a hydraulic height of 14.5 meters. It is the first stage of two (2) cascade water resource projects developed and implemented on this river under a Build-Operate-Transfer (BOT) structure for an operation period of 49 years by Enova Energy Company, jointly constituted by Özaltın and Nurol Investment Companies with their respective ownership stake at 50% each.

The low-head dam supports the power station with tripple pit-type horizontal axis Kaplan gravity flow turbines, driving generators with a rating of 8.3 MW each, for a total capacity of 25 MW, it produces 109 million kWh of clean, renewable energy a year. Construction of the project began in late 2007. All three (3) units were placed into commercial operation in 2010.

FACTS & FIGURES
Location:

Osmaniye, TÜRKİYE

Owner / Operator:

Enova Energy Company (50% held by Özaltın Construction Company)

Type of Contract:

Build-Operate-Transfer (BOT)

Term of Contract:

49 Years

Installed Capacity:

25 MW

Annual Power Generation:

109 million kWh

Project Status:

Operational

Enova Enerji Logo

Enova Energy

Güvenevler Mahallesi Gelincik Sk. No:2 D:3 06690 Çankaya/Ankara/Türkiye