T08-05 Highway Reconstruction Lot 2 Project
FACTS & FIGURES
Client: Zaporijya State General Directorate of Highways |
Contractor: Özaltın Construction Co., Inc. |
Location: Kamyanka-Vesele Section, UKRAINE |
Length of Highway: 20.77 km |
Platform Width: 8.5 m (2x1 Highway) |
Pavement Type: Asphalt Pavement |
The Intercity State Highway T-08-05 Kamianka-Dniprovska-Velyka, Bilozerka-Vesele/M-14/Reconstruction Km:23+007-44+800 involves the 20.77-kilometer section of the road connecting Kamianka-Dniprovska District and Vesele District in Zaporija Oblast, Ukraine.
FACTS & FIGURES
Client: Zaporijya State General Directorate of Highways |
Contractor: Özaltın Construction Co., Inc. |
Location: Kamyanka-Vesele Section, UKRAINE |
Length of Highway: 20.77 km |
Platform Width: 8.5 m (2x1 Highway) |
Pavement Type: Asphalt Pavement |